Modular Installation Saves Downtime and Increases Consistency
A customer needed an installation completed in a very short window of time, so CSI decided to standardize and convert the system to a module or skid.
A customer needed an installation completed in a very short window of time, so CSI decided to standardize and convert the system to a module or skid.
The largest skids had to be built in two sections so they could be transported to the customer.
CSI developed a commercially available alloy that a biotechnology company could economically source for their process piping.
CSI was approached by an engineering firm to provide clean-in-place (CIP) systems for a large greenfield animal health facility.
The customer, a global producer of food and beverage products, contacted CSI to fix their frequent leaking issues with existing fittings.