Installation
0 Results
Installation
CSI created this tidy piping installation in the field
Installation
CSI's field work in this facility includes the piping of a CSI fabricated valve manifold, transfer panels, and COP tank
Installation
A CSI piping installation, including a CSI tiered transfer panel and COP tank
Installation
CSI installation of piping and conduit
Installation
An array of CSI-installed shutoff valves
Installation
A wall mounted divert valve manifold with quick-connect air line connections
Installation
A CIP system fabricated and installed by CSI
Installation
These hot water sets built by CSI supply jacketing to silos and surrounding piping
Installation
Insulated unloading station with enclosures and support structure
Installation
In-process field installation of piping on backside of transfer panel, with purge tape visible on the tack-welded connections
Installation
A COP Tank alongside a self-closing plate heat exchanger
Installation
A CSI-installed transfer panel with in-line sight glass for an egg breaking application
Installation
An egg breaking process featuring a surge pot and transfer pump
Installation
This installation of an inedible vacuum line features long sweep elbows
Installation
Egg breaking with surge pot and transfer pump
Installation
This multi-compartment COP tank with side and end jet configurations was fabricated and installed by CSI
Installation
A complete CIP system fabricated and installed by CSI
Installation
Horizontal tank piping installed by CSI's field crew
Installation
Piping for a homogenizer and separator in a dairy application
Installation
A complex CSI installation in a high density piping area for an HTST pasteurization system
Installation
High density HTST system piping in a small space with CSI-fabricated hold tubes
Installation
Whole egg filter assemblies piped by CSI
Installation
Wall mounted divert valve manifold with quick-connect air line connections
Installation
CSI crew performing I/O checkout on a control panel for an installed system
Installation
CSI field crew welds piping for silo lines
Installation
Stainless steel tubing supported with wall-mounted pipe racks
Installation
These air lines supply air to the divert valve manifold overhead
Installation
CSI installed the piping and valves for this silo
Installation
The piping above this tank was installed by CSI's field crew
Installation
Supply piping and flex tube for a tank
Installation
A complex piping system with pumps and transfer panel
Installation
Piping and equipment for a sauce kitchen installed by CSI
Installation
Sauce kettles installed by CSI's field crew
Installation
Flow meters and piping for an installed sauce kitchen
Installation
An array of Tri-Clover 700 series valves installed by CSI
Installation
Supply lines for sauce kettles, including pipes that are insulated for safety
Installation
CIP supply lines installed by CSI's field crew
Installation
CSI installed this CIP return header and pump in a silo alcove hallway
Installation
A silo alcove with in-process installation of a CIP return header and pump
Installation
Installed three-tank CIP system
Installation
Supply pump, piping, and other equipment complete a three-tank CIP system
Installation
Supply piping for an egg wash process
Installation
Installed self-closing plate heat exchanger with extra available capacity
Installation
Neatly arranged piping installed by CSI's field crew
Installation
Installed piping on an inedible vacuum line
Installation
Installation of a dual filter assembly
Installation
Multi-compartment COP tank with side and end jet configurations
Installation
CSI installed a transfer panel and CIP supply/return lines in this tanker unloading bay
Installation
Installed three-tank CIP system
Installation
Whole egg filter assemblies